Skip to main content

Orlando to install fencing at Pulse site ahead of demolition in March

Temporary memorial to be replaced by permanent tribute

ORLANDO, Fla. – The city of Orlando is moving forward with changes at the Pulse nightclub site, a location that has become a daily pilgrimage for those mourning the 49 victims of the 2016 mass shooting.

As the city prepares to install construction fencing and demolish the site, some community members express reluctance about losing the temporary memorial that has stood for years. The rainbow-colored tribute, which has become a symbol of both tragedy and resilience, will soon disappear to make way for a permanent memorial.

“It’s been here so long, it should just stay like this and serve as the memorial itself,” says Trudy Verry, who lives near the Pulse site. “I feel like if they did it right after it happened, it wouldn’t have been so controversial. But now, after so long, and after all the chalk stuff that happened, it will be a really really big deal that it will be taken down.”

The site recently became a focal point of controversy after the state ordered nearby rainbow crosswalks to be painted over. In response, community members returned with chalk, transforming the sidewalks into messages of remembrance.

[BELOW: Pulse nightclub building removal set as Orlando advances memorial plans]

For visitors like Suzanne Middleton, who traveled from out of state to see the memorial before its transformation, the timeline of changes carries additional weight.

“I can’t believe it’s been 10 years... but this is kind of sacred ground. And I kind of think it should be,” Middleton said.

According to city officials, construction fencing will be installed on or near Feb. 2. While the temporary memorial will become inaccessible once fencing is in place, the city plans to designate a small area where visitors can leave perishable items, such as flowers, during construction.

The building’s removal is scheduled for mid-March as plans progress for the permanent memorial. The city has scheduled a public update meeting on the design plans for March 5 at 4 p.m. Residents can review the plans at pulseorlando.org.


Recommended Videos